The $376,088.36 in Mississippi’s June 9, 2026 I-20 at Halls Ferry Road action is a ceiling on a design work assignment, not the price of building the project. Item 5 authorizes geotechnical investigation, final right-of-way plans and final construction plans for a Warren County project. Approved June 9 agenda

Reading the assignment

Field in item 5What it identifies
LocationI-20 at Halls Ferry Road, Warren County
ProjectSTBG-0020-01(295)/100367-109100
Work assignmentNS-RWD 2023-15 under a roadway-design master contract
Authorized scopeGeotechnical investigation; Phase A final right-of-way plans; Phase B final construction plans
AmountNot to exceed $376,088.36 for that assignment

The word “final” qualifies the plans. It does not report completed construction. Likewise, a right-of-way plan is not evidence that a particular owner’s property has been acquired.

Use the project number, not just “I-20 work”

This assignment is different from the Warren County I-20 overlay and bridge-repair records numbered 109482 and 109684. The proposed schedule updated October 3 still lists those two projects for October 2026, with separate paving and bridge scopes. It is a proposed letting list, not confirmation that either has started. Our separate overlay/bridge comparison explains their identities. A shared interstate does not make their budgets or dates interchangeable.

When seeking a later Halls Ferry decision through the Commission records, include 100367-109100 and NS-RWD 2023-15. Ask whether the response concerns this design assignment or a later construction-phase record. That distinction prevents an unrelated I-20 contract from being mistaken for the Halls Ferry project.

Record scope

LSL reread June agenda item 5 September 13, 2026; that historical source date remains unchanged. On October 3 we checked the rendered Commission record route and the distinct 109482/109684 schedule rows. The portal displays a September 22 agenda link and an elapsed September 22 “next meeting” label; this is not confirmation of a future meeting or a substantive review of that agenda. This article explains the June authorization, not whether its deliverables remain unfinished or whether any later Halls Ferry action exists. No Halls Ferry construction award, start, lane closure or parcel impact was established. Next scoped route/project-identity check: October 17.